Topaicí molta laistigh de do chuardach.
Topaicí molta laistigh de do chuardach.
-
1de réir Ministry of Health and Population Government of Nepal“… of Finance in February 2010, but they make different assumptions about absorption and about future growth…”
Foilsithe / Cruthaithe 2012
Faigh an téacs iomlán
Technical Report -
2Foilsithe / Cruthaithe 2016“… was 114 outlets: 19 outlets per five development regions and 19 outlets in the Kathmandu metropolitan area…”
Faigh an téacs iomlán
Technical Report -
3
-
4“… September 2002-March 2003 at Bhaktapur district. In the study, 305 registered in 19 DOTS centers and sub…”
Faigh an téacs iomlán
Technical Report -
5
-
6de réir New ERA“…) was launched on February 20, 2009. A total of 400 truckers were recruited for the study at the Pathlaiya study…”
Foilsithe / Cruthaithe 2012
Faigh an téacs iomlán
Technical Report -
7“… was collected during the period of February-September 2003. The study adopted a model to make a comparative…”
Faigh an téacs iomlán
Technical Report -
8
-
9de réir New ERA“… in the study areas. The fieldwork started on 19 January and was completed on 23 February 2009. Study…”
Foilsithe / Cruthaithe 2012
Faigh an téacs iomlán
Technical Report