Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015
Background: A roadmap for the NHSP 2010-15 preparation process was prepared at a January 2009 workshop in Pokhara, attended by the two secretaries, senior MoHP and DoHS staff, and EDPs. Thernatic task teams were formed and prepared draft that were submitted to the programme development team at the e...
Saved in:
Main Author: | |
---|---|
Format: | Technical Report |
Language: | en_US |
Published: |
2013
|
Online Access: | http://103.69.126.140:8080/handle/123456789/330 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
oai:103.69.126.140:123456789-330 |
---|---|
record_format |
dspace |
spelling |
oai:103.69.126.140:123456789-3302022-11-09T05:24:30Z Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 Ministry of Health and Population Background: A roadmap for the NHSP 2010-15 preparation process was prepared at a January 2009 workshop in Pokhara, attended by the two secretaries, senior MoHP and DoHS staff, and EDPs. Thernatic task teams were formed and prepared draft that were submitted to the programme development team at the end of November 2009. A small technical working team was formed in December 2009, and produced a first in December –January based on the inputs prepared by the thernatic task teams. 2013-04-07T22:17:44Z 2022-11-08T10:14:22Z 2013-04-07T22:17:44Z 2022-11-08T10:14:22Z 2010 Technical Report http://103.69.126.140:8080/handle/123456789/330 en_US application/pdf application/pdf application/pdf |
institution |
My University |
collection |
DSpace |
language |
en_US |
description |
Background: A roadmap for the NHSP 2010-15 preparation process was prepared at a January 2009 workshop in Pokhara, attended by the two secretaries, senior MoHP and DoHS staff, and EDPs. Thernatic task teams were formed and prepared draft that were submitted to the programme development team at the end of November 2009. A small technical working team was formed in December 2009, and produced a first in December –January based on the inputs prepared by the thernatic task teams. |
format |
Technical Report |
author |
Ministry of Health and Population |
spellingShingle |
Ministry of Health and Population Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 |
author_facet |
Ministry of Health and Population |
author_sort |
Ministry of Health and Population |
title |
Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 |
title_short |
Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 |
title_full |
Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 |
title_fullStr |
Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 |
title_full_unstemmed |
Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 |
title_sort |
nepal health sector programme implementation plan ii (nhsp-ip 2) 2010-2015 |
publishDate |
2013 |
url |
http://103.69.126.140:8080/handle/123456789/330 |
work_keys_str_mv |
AT ministryofhealthandpopulation nepalhealthsectorprogrammeimplementationplaniinhspip220102015 |
_version_ |
1761500960520142848 |