Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015

Background: A roadmap for the NHSP 2010-15 preparation process was prepared at a January 2009 workshop in Pokhara, attended by the two secretaries, senior MoHP and DoHS staff, and EDPs. Thernatic task teams were formed and prepared draft that were submitted to the programme development team at the e...

Volledige beschrijving

Bewaard in:
Bibliografische gegevens
Hoofdauteur: Ministry of Health and Population
Formaat: Technical Report
Taal:en_US
Gepubliceerd in: 2013
Online toegang:http://103.69.126.140:8080/handle/123456789/330
Tags: Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
id oai:103.69.126.140:123456789-330
record_format dspace
spelling oai:103.69.126.140:123456789-3302022-11-09T05:24:30Z Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015 Ministry of Health and Population Background: A roadmap for the NHSP 2010-15 preparation process was prepared at a January 2009 workshop in Pokhara, attended by the two secretaries, senior MoHP and DoHS staff, and EDPs. Thernatic task teams were formed and prepared draft that were submitted to the programme development team at the end of November 2009. A small technical working team was formed in December 2009, and produced a first in December –January based on the inputs prepared by the thernatic task teams. 2013-04-07T22:17:44Z 2022-11-08T10:14:22Z 2013-04-07T22:17:44Z 2022-11-08T10:14:22Z 2010 Technical Report http://103.69.126.140:8080/handle/123456789/330 en_US application/pdf application/pdf application/pdf
institution My University
collection DSpace
language en_US
description Background: A roadmap for the NHSP 2010-15 preparation process was prepared at a January 2009 workshop in Pokhara, attended by the two secretaries, senior MoHP and DoHS staff, and EDPs. Thernatic task teams were formed and prepared draft that were submitted to the programme development team at the end of November 2009. A small technical working team was formed in December 2009, and produced a first in December –January based on the inputs prepared by the thernatic task teams.
format Technical Report
author Ministry of Health and Population
spellingShingle Ministry of Health and Population
Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015
author_facet Ministry of Health and Population
author_sort Ministry of Health and Population
title Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015
title_short Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015
title_full Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015
title_fullStr Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015
title_full_unstemmed Nepal health sector programme implementation plan II (NHSP-IP 2) 2010-2015
title_sort nepal health sector programme implementation plan ii (nhsp-ip 2) 2010-2015
publishDate 2013
url http://103.69.126.140:8080/handle/123456789/330
work_keys_str_mv AT ministryofhealthandpopulation nepalhealthsectorprogrammeimplementationplaniinhspip220102015
_version_ 1761500960520142848